    ​In the spring of 2019, J.Gill and Company was hired to perform extensive concrete repairs to the parking structure located at the corners of State St., Kinzie St., and Wabash St. in downtown Chicago. Over 10,000 SF of full-depth concrete floor slab was removed and replaced. Over 1500 SF of concrete beam repair  &  over 1400 SF of concrete ceiling repair was completed.  Phasing of this project allowed vehicle traffic to flow around our work area via drive lanes to minimize any revenue loss for the parking garage during the repairs. While some repairs were done to the existing concrete waterproofing system, a new waterproof traffic coating system was applied to all the new concrete patches. This $1 million  project was completed in early July 2019. 


Project: State Kinzie Wabash Garage (Chicago, IL)